US FDA hits Indoco with warning due to leaky glaucoma drug

By Dan Stanton contact

- Last updated on GMT

Image: iStock/aga7ta
Image: iStock/aga7ta

Related tags: Fda warning letter, Food and drug administration

Leakage problems for of an ophthalmic drug has landed contract manufacturer Indoco Remedies with a US FDA warning letter at its plant in Goa.

In September​, Indian API and finished formulation maker Indoco Remedies received a Form 483 with six observations following an inspection by the US Food and Drug Administration (FDA) at its Goa II facility.

“We submitted our comments to FDA in November 2016 and were eagerly awaiting for the EIR [Establishment Inspection Report],”​ MD Sundeep Bambolkar said during a conference call Monday.

“Based on the review of compliance, FDA has accepted our response to five observations. However, the FDA remains concerned with one observation pertaining to a specific product for which Indoco is a contract manufacturer [and] on Friday 31 March we received a warning letter from FDA.”

The observation relates only to latanoprost ophthalmic solution – a generic version of Pfizer’s Xalatan – which Indoco makes for a US partner. The contract generates revenue of around INR250m ($3.8m) for Indoco each year.

According to Bambolkar the FDA has concerns about the potential of leakage of the product during shipping and issues with the level of communication Indoco has with its US partner.

He added despite the warning, the FDA has not issued an import alert and Indoco is free to continue to supply this and other products from the Goa plant.

“As for US FDA recommendations we are in the process of appointing a cGMP consultant and we shall respond to the warning letter within the stipulated time of 15 days. We will continue to supply the existing product from the aforementioned facility to meet our obligations to our customers and the patients in the USA.”

During the call, Indoco did not reveal its US partner but it is fully aware of the problem.

Related news

Related products

show more

How to resolve sticking issues in tablet production

How to resolve sticking issues in tablet production

I Holland Limited - Tabletting Science | 24-Jun-2019 | Case Study

Tablet sticking is one of the most common problems in tablet manufacture. Find out how I Holland used the TSAR scientific predictive model and expert tablet...

How to measure powder and granule flow properties

How to measure powder and granule flow properties

Stable Micro Systems | 01-Apr-2019 | Technical / White Paper

Being able to predict, optimise and control powder flow is of prime importance to manufacturers in ensuring high quality standards. Download this free...

From Candidate to Clinic- European Capabilities

From Candidate to Clinic- European Capabilities

Catalent Pharma Solutions | 22-Oct-2018 | Technical / White Paper

Catalent’s Nottingham, UK facility focuses on early stage development of small molecule drug candidates from the bench to clinic. This facility offers...

Accelerate your supply chain as pressures intensify

Accelerate your supply chain as pressures intensify

William Reed | 17-Sep-2018 | Technical / White Paper

Food, Drink and Non-Food manufacturers are under pressure. Range reviews, massive retail mergers, the backlash against plastic packaging and the ongoing...

Related suppliers

Follow us

Products

View more